NEW LIFEPainting & Remodeling

Resources

A little planning. A better remodel.

Explore costs, timelines, and practical decisions for your Austin-area kitchen, bathroom, or home renovation.

White marble-look shower with clear glass, a tiled bench and recessed storage

Bathroom Remodeling

How much does a tub-to-shower conversion cost in Austin?

Published Austin pricing examples start around $7,000 for a basic tub-to-shower conversion and run $11,000–$22,000 for a fuller scope. Treat these as rough planning figures. Your shower base, drain work, tile and glass determine the written estimate for your home.

Read the guide
Warm wood flooring across an open living room with white built-ins and a fireplace

Flooring

How much does hardwood floor installation cost in Austin?

For early budgeting, published Austin guides offer examples of $12–$20 per square foot for installed engineered hardwood and $14–$25 for solid hardwood. These are rough planning figures, and the included work varies. To turn a rate into a room budget, measure the area, then price removal, subfloor preparation, trim and stairs separately where needed.

Read the guide
Gloved hand positioning floor tile with leveling clips over ridged setting mortar during renovation

Bathroom Remodeling

The Bathroom Remodeling Process: A Step-by-Step Austin Guide

The bathroom remodeling process starts with scope, layout, and product selections. Construction then moves through protection, demolition, rough work, wet-area preparation, tile, fixtures, and glass before the final walkthrough. The key is knowing which decisions each stage needs.

Read the guide
Modern bathroom design inspiration with a glass shower, floating vanity, and warm neutral finishes

Bathroom Remodeling

How Long Does a Bathroom Remodel Take?

A focused bathroom update may take 1 to 2 weeks, many full bathrooms take 3 to 6 weeks of active construction, and larger primary-bath remodels can take 6 to 10 weeks or longer. Planning, materials, and permits may add time before work begins.